Next Page
 
 


Excavation was followed at last by construction. By mid-October six steel pipes for internal drainage from the roof and structural support were in place. 

Above: Drainage pipes and concrete supports.
Top right: Lawrence Kocher and Theodore Dreier survey the site.
Center right and bottom: Foundation excavation.

Photogapher: John Harvey Campbell (above and right center)
Photos courtesy North Carolina State Archives, Black Mountain College Papers (right top and bottom)

 

 

The Black Mountain College Project gratefully acknowledges a grant from the Graham Foundation
for Advanced Studies in the Fine Arts for a study of architecture at Black Mountain College.